A Study of the Operational Conditions Influence on the Performance of Kirkuk Gas Plant

Document Type : Research Paper

Author

foundation of technical education / technical in statute / Hawija

Abstract

Kirkuk gas turbine power plant is supplied by the gaseous fuel from north gas company. The results showed that the theoretical efficiency of the unit is a function for two parameters; the compressor input temperature and the pressure ratio rp . So, the pressure rp ratio depends directly on the compressor input temperature. If the net work of the unit Wnet (Wt - Wc) is taken to be an index for the performance, the efficiency ƞ will be more in summer than that in winter because of the considerable reduction in compressor work Wc , while if the specific energy produced (or consumed specific fuel SFC) is taken as an index for the performance; the actual efficiency ƞac is more in winter since the specific energy produced in winter is greater approaching (4.5 kW.hr.m-3), while it did not exceed (2.8 kW.hr.m-3) in summer, this belong to the performance improving as the load increases approaching the design load, this is prevailing on the power plant operated by the diesel, heavy fuel or crude oil.

Keywords